Solar-C

Introduction


Construction Images

The Solar-C dome is being built as an addition to the existing Zodiacal Light building on Haleakala. The pictures here
show some of the construction. Click on the images to get full-sized (1280 x 960) JPEG images.
 
Troweling the slab, October 1998.
Quality control.
Making sure it cures properly.
Starting the walls, April 27 1999.
Setting the studs.
Finishing the top plate.
The door works.
Adding the siding, April 29.
Sunburn alert!
Maybe a hot tub?
Installing the dome base ring, May 5.
Fine adjustments.
The completed ring.
Assembling the dome, May 12.
Hand me another piece!
Half-dome.
Incoming!