Mees Bimonthly Technical Task List
Meeting of May 27, 1999
Tasks/Person(s) responsible
FIRST PRIORITY - IMMEDIATE IMPACT ON OPERATIONS
-
1) IVM fast guider: MFW, LH, DLM
- a) Finish redesign and rebuild IVM internal guider connections
-
3) IVM prefilter: MFW, DLM, BJL, GN
- a) Complete purchase of tunable prefilter
- b) Understand control circuit design and component locations
-
4) IVM datasystem upgrades: DLM, BJL, EKO, MFW
- a) Finish debugging new CCD camera software
- b) Test optics for ghost removal, image quality
- c) Filter and shield the DC/DC power supplies to cut out noise
-
5) MCCD: GN, EKO, BJL
- a) Fix fast guider failure
-
6) POI: GN, BJL
- a) Modify mount for old 11cm K-Line lens, install, rearrange optics.
- b) Modify observing code for time series.
SECOND PRIORITY - LONG-RANGE IMPACT ON OPERATIONS
-
2) Dome seeing improvement: DLM, BJL, GN, MFW, LH
- a) Design, build, install spar front heatshield.
- b) Design and cost dome exhaust fans.
- c) Design and cost dome interior insulation.
- d) Identify better material for windscreens.
-
5) Improve observatory operation documentation: BJL, DLM, GN, EKO
- a) Document SPAM design and operation
- b) Evaluate Web Browser front end for SPAM
- c) Unify and document realtime data and log pipelines
- d) Develop tracking system for maintenance, repairs, critical procurements
-
6) New spar guider: BJL, DLM, EKO, LH, MFW
- a) Review existing electronics schematics to determine if limb signal can be extracted in a useful place
- b) Look at signals with scope to make sure their characteristics are understood.
- c) Locate solar cells for alternative secondary detector, investigate design issues.
- d) Analyze digitizer location (in spar vs in PC) impact on design & performance.
- e) Rough out software design for guider system.
- f) Resurrect PC host platform (components, OS)
- g) Define cabling to interface drive amps to motors.
-
8) MCCD upgrade: DLM, MFW, BJL
- a) Identify camera and computer system options
- b) Inventory all existing and desired control systems
- c) Discuss concept for user interface
A
- d) Inventory upgrade options beyond basic camera/computer change
- e) Set up Hypermail archive for discussion
-
10) Mees building maintenance: GN, MM, BJL
- a) Test paints for exterior to minimize heating.
- b) Survey dome and building interior for repair/painting/maintenance.
- c) Schedule a work week and tasks.
-
11) Electric power quality:LH
- a) Measure load from each instrument/rack/unit
- b) Rebalance across power phases
- c) Get correct sized UPS as needed
Progress to date
First Priority Task #1
IVM fast guider
First Priority Task #2
Install new cabling for 10" occulter
First Priority Task #3
IVM prefilter
First Priority Task #4
IVM datasystem upgrades
First Priority Task #5
MCCD
a) Fast guider failure was caused by a bad power supply. Les
fixed it by tapping power from another supply.
First Priority Task #7
POI
Second Priority Task #1
Reaction mass stabilizer
Second Priority Task #2
Dome seeing improvement
Second Priority Task #3
Mees video organization
Second Priority Task #4
Dust control in Coude room
Second Priority Task #5
Improve observatory operation documentation
b) Don went to an Oracle demonstration of database tools.
We learned that the HESSI database will use the IDL Database
tools.
c) A Hypermail archive has been setup to access the Mees Observing logs.
Second Priority Task #6
New spar guider
Second Priority Task #7
Field lens repolishing
Second Priority Task #8
MCCD upgrades
a) A survey of CCD camera vendors has been done and talks with
Photometrics are progressing.
Second Priority Task #9
New coronagraph site planning
Second Priority Task #10
Mees building maintenance
Second Priority Task #11
Electric power quality
Last modified: Thu Jun 10 23:50:09 HST 1999